Asbestos Abatement SJ Carew (Engineering) Building

Asbestos Abatement SJ Carew (Engineering) Building EN-1035 and EN-1035E

Memorial University would like to advise the occupants of the SJ Carew (Engineering) Building that asbestos abatement will take place in Rooms EN-1035 and EN-1035E from Dec 27-31.

This work will be done in accordance with the Newfoundland and Labrador Occupational Health and Safety Act and Regulations and the Memorial University Asbestos Management and Abatement Policy. Only competent and certified personnel will be permitted to enter or work in the designated area.

The work area will be isolated by physical barriers, and warning signs will be posted to identify the work area. Shut down or modification, as necessary, of the heating, ventilation, and cooling (HVAC) system as well as other controls will ensure other spaces of the building remain free of contamination. Air monitoring will be conducted throughout the course of the abatement process to ensure no harm to occupants or to the removal specialists. Clearance air monitoring will be conducted prior to re-occupancy of the abatement area. Final monitoring results will be available from Environmental Health and Safety at the completion of the project.

Environmental Health and Safety asks all occupants to observe the following precautions: do not disturb the work site or material, respect and observe signage and the contractor's work area, and report any possible infractions to health.safety@mun.ca or after hours to Campus Enforcement and Patrol (CEP) at (709) 864-4100.

If there are any questions or concerns, feel free to contact Environmental Health and Safety by email at health.safety@mun.ca

Environmental Health and Safety appreciates your time and patience while this important work is completed.